Begin installation on side away from wind rain direction.
Westman steel roofing installation guide.
Install roof trim flashing and westman steel underlayment step 3.
Accurately measure the roof and create a roof plan for estimating and ordering roof panels and accessories ensure all required roof penetrations are in place before beginning pluming vents exhaust attic venting etc remove any dirt or debris from.
Underlayment is to be installed over the eave starter.
Installation guide important notes.
Wall sheeting step 9.
Fasten eave starter with 10 x 1 long galvanized zip screws 12 o c.
Clean sheets of any debris before installation.
Roof sheets step 4.
During cutting secure sheets to ensure clean cuts.
Stack short sheets on top of longer ones.
Install eave starter at all eaves.
Screw length is to be long enough to penetrate the decking.
Take care the first piece is aligned precisely perpendicular square to the edge.
Drive through the outside closure and the ribs of the panel beneath.
From basic sheet steel cladding to snaplok roofing panels and on to more sophisticated steel shingles with stone coating and even steel spanish tiles.
Fasten valley in place with clips and fasteners on the outer edge of the valley every 16 on center.
Installation guide handling.
For curved cutting use a jigsaw or metal cutting shears.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Add the metal panels.
5 outside closure install along upper edge of panels about 2 below the edge.
Installation consists of the following steps.
Always begin working at the point with the longest peak to eave distance.
Store sheets in a cool and dry place out of direct sunlight.
Install ridge cap step 5.
Install base flashing step 7.
To prevent solar heat buildup avoid covering the stack of sheets with a dark tarp or other heat absorbing material.
Gable trim after applied step 6.
3 roofing panel install with lower edge overhanging eave edge by at least 1.
Material checklist step 2.
Simply choose the installation guides appropriate for your project.
Achieving rooftop architectural expressions is easy with westman roofing products.
Notch hem of top valley and overlap valley 4 and put 2 rows of sealant between overlap.
Other wall trims and flashings step 8.
When installing roofing panels take care to avoid walking on the butt of the panels.
Trim the bottom of the valley to the correct angle and allow 5 8 to bend around the eave starter.